Assessed case by case

A project in Czechia?

Czechia isn't yet part of our established network of local contacts. We assess every project case by case, though, and can bring in a trusted local partner (lawyer, accountant) if needed to create and direct your structure.

How long does it take to open your company?

The path to creating a s.r.o. in Czechia, step by step

These timelines assume a complete file (ID documents, supporting evidence, governance decisions made): an incomplete file is the single most common cause of delay, ahead of the administrative timelines themselves. Once the file is genuinely complete, expect generally 5 to 14 days for the legal process itself.

Minimum share capital: CZK 1.

1 week

Project scoping & complete file

Gathering ID documents, mandate, governance decisions and choice of bank — the essential groundwork for the legal timelines below to actually start running.

Mandatory

Notarial deed

The incorporation deed must take the form of a notarial deed, drawn up by any Czech notary.

Before the deed

Nominal minimum capital

Minimum capital of just 1 Czech crown; below CZK 20,000, no specific bank account is needed for the deposit.

5 to 14 days

Direct registration by the notary

With direct filing to the commercial register by the notary, the overall timeframe is 5 to 14 days.

If foreign director

Apostille of documents

If the director is a foreign national, their documents generally need an apostille.

1 week

Safety margin — opening the bank account

On top of the legal timelines above, allow one week of banking margin: KYC checks, extra documentation or a branch appointment can extend account opening, particularly for a non-resident director.

VAT

Taux
Standard rate21%
Reduced rates12%food, medicines, books
Reduced rates0%certain essential goods

Corporate tax

21%.

Is a visa required?

Not required for incorporation itself. A residence permit becomes necessary only if the director wants to reside in Czechia to carry out professional activity on-site.

Information provided for guidance (July 2026), subject to change depending on local regulation, the bank and the relevant authority. We confirm the precise timeline with you during the initial assessment of your project.